Thermocycle Conditions 7-2-13

2015-01-13

azim58 - Thermocycle Conditions 7-2-13


Thermocycle Conditions 7-2-13
has been associated with pm ss tdwn (pm = primestar max, ss = small
primer start, tdwn = touchdown)

95 C 15 s, 95 C hold, 95 C 2 min, 95 C hold,
98 C 10 s, 65 C 10 s, 72 C 60 s,
98 C 10 s, 64 C 10 s, 72 C 60 s,
98 C 10 s, 63 C 10 s, 72 C 60 s,
98 C 10 s, 62 C 10 s, 72 C 60 s,
98 C 10 s, 61 C 10 s, 72 C 60 s,
98 C 10 s, 60 C 10 s, 72 C 60 s,
98 C 10 s, 59 C 10 s, 72 C 60 s,
98 C 10 s, 58 C 10 s, 72 C 60 s,
98 C 10 s, 57 C 10 s, 72 C 60 s,
98 C 10 s, 56 C 10 s, 72 C 60 s,
(98 C 10 s, 55 C 10 s, 72 C 60 s)X15
4 C hold, 98 C hold
(98 C 10 s, 55 C 10 s, 72 C 60 s)X30
4 C hold
(98 C 10 s, 55 C 10 s, 72 C 60 s)X15
4 C hold
(98 C 10 s, 55 C 10 s, 72 C 60 s)X10
4 C hold

1st part to warm up thermocycler
2nd part to denature
3rd part to add polymerase and denature further
10 decreasing annealing temperature cycles for touchdown
amplification for 15 cycles with the small amount of primer originally
added (1 uL of 2 uM forward and reverse primer each; 0.04 uM final
concentration each primer at this point)
98 C hold for addition of more primer (1 uL of 10 uM forward and reverse
primer each; 0.24 uM final concentration each primer at this point)
30 cycles of amplification
4 C hold for removal of an aliquot if desired (e.g. 20 uL)
15 cycles of amplification
4 C hold for removal of an aliquot if desired (e.g. 20 uL)
10 cycles of amplification
4 C hold for removal of remaining sample (e.g. 10 uL)


Timing
80s*10+80s*15 = 2000s = 33.33m
1600s = 26.67m
1200s = 20m
800s = 13.33m


see also PCR by starting with a small amount of primer and later adding
more primer and polymerase portal 4-11-13