Pierce Silver Stain Protocol

2015-01-13

azim58 - Pierce Silver Stain Protocol


Pierce Silver Stain Protocol
Item 24612
http://www.piercenet.com/instructions/2161478.pdf
Note that this pdf contains more information and a more in-depth protocol
than the protocol below



o Make sure to handle the gel with clean gloves or sterile
equipment to avoid later smudges on the gel

ultrapure water.
water).
o Make sure that any silver stain reagents are discarded in an
appropriate silverstain waste container.

Developer).
2-3 minutes until bands appear.